About the Project

P006: Manila Gold Coast Reclamation (Sand Search for MGDC and Jan De Nul Philippines Inc.)

14 BH. Water depth from 25 to 40m.

Date: March 2022 to April 2022

Vessel Used: Crane Barge La Roche

On February 2022, Manila Goldcoast Development Corporation (MGDC), with supervision from Jan de Nul Phil (JDN), awarded to SRGEC the contract to drill eleven (11) boreholes with water depths of up to 40 meters in Manila Bay. Included in the project are undisturbed sampling and laboratory testing (index Property). The operation started in March 2022 and ended in April 2022. Eventually, an additional three (3) boreholes were added to the project while still finishing the field works ahead of schedule. Laboratory testing of the samples was completed a month later. The project is intended for the reclamation project of MGDC in Pasay City.