About the Project
P003: Bacoor Reclamation (In Situ Geotechnical and Geophysical surveys for Robinson Land)
25 BH. <5m water depth. PS suspension logging.
Date: August to October 2021
Vessel Used: Jack-Up Pontoon #1, #2, and #3 with PS suspension equipment
The scope of work includes soil sampling and in situ testing. It can be summarized as follow:
- Drilling of twenty-five (25) boreholes until 40 m deep, with:
- Undisturbed Sampling;
- SPT test;
- In situ PS Suspension Logging in six (6) boreholes with an individual tests every meter:
- Determining Shear and Compression velocity (Vs and Vp);
- Deriving Poisson coefficient and dynamic moduli;
- Laboratory tests on surface and underground samples;
- Factual report summarizing the results of the investigations and laboratory testing.
For the drilling activities, the here-under table summarizes the actual in situ completion of the 25 boreholes: