About the Project

P003: Bacoor Reclamation (In Situ Geotechnical and Geophysical surveys for Robinson Land)

25 BH. <5m water depth. PS suspension logging.

Date: August to October 2021

Vessel Used: Jack-Up Pontoon #1, #2, and #3 with PS suspension equipment

The scope of work includes soil sampling and in situ testing. It can be summarized as follow:

  • Drilling of twenty-five (25) boreholes until 40 m deep, with:
    • Undisturbed Sampling;
    • SPT test;
  • In situ PS Suspension Logging in six (6) boreholes with an individual tests every meter:
    • Determining Shear and Compression velocity (Vs and Vp);
    • Deriving Poisson coefficient and dynamic moduli;
  • Laboratory tests on surface and underground samples;
  • Factual report summarizing the results of the investigations and laboratory testing.

For the drilling activities, the here-under table summarizes the actual in situ completion of the 25 boreholes: