About the Project

P008: Pasay Harbor City Reclamation (Sand search for PHCC)

11 BH. Water depth from 17 to 40m.

Date: July 2022 to October 2022

Vessel Used: Barge SP-B2

On July 2022, SRGEC was again Contracted by PHCC under the supervision of AMH Philippines to conduct geotechnical drilling and undisturbed sampling in Manila Bay. Eleven (11) boreholes were contracted and drilled up to 30 meters below the seabed with a water depth of 40+ meters. Even with prolonged bad sea and weather conditions during the project period, SRGEC was still successful in completing the project within the timeline. This project showed how SRGEC can work in adverse environmental conditions and still provide quality results. The fieldwork was conducted using a cantilever platform onboard the barge SPB-2. The additional sand source is intended for the reclamation project of Pasay Harbor City Corporation (PHCC) in Pasay City.