About the Project

P004: Pasay Harbor City Reclamation (Sand Search for Boskalis)

BH & VC

Water depth: 10 to 30m deep

Date: February 2022 to June 2022

Vessel Used: Jack-up barges #1 and #2 with Crane Barge “La Roche”

The scope of work includes numerous Boreholes and Vibrocore and in situ testing.

The termination depth of the boreholes has been instructed on-site by BPI supervisors. The VC penetrating depth is
according to the equipment limitation and site conditions.

Laboratory tests are not part of this scope. VC Samples have been handed over to BPI directly on-site after extraction.